The landlords sons new house is coming along. They finished putting up the walls for the second floor and then got it ready to pour the roof. I was gone when they poured the roof for the first floor or the floor for the second floor whichever you want to call it. Roy told me that they did it with a traditional pour using lots of men and labour. This time they decided to get the cement truck along with the truck with the long arm on it for sending the cement right up to the roof. This is more costly; but results in a faster, better pour with no seams to leak, hopefully.
They still had quite a few guys to work; but it was much easier for them than carrying 5 gallon pails of cement up to the third level. This way they just had to spread and smooth it out.
The guys ready to go.
The arm truck which is connected to the cement truck.
Getting to work.